Skip to content Skip to footer

Slough Borough Council Use RediKerb Surface Kerbing For a New Road Layout

Shaggy Calf Lane in Slough has been a regular maintenance issue for Slough Borough Council due to frequent power supply failure to the traffic lights. This has led to long delays for motorists and disruption to local residents.

Continuous run of black and white RediKerb creating central island and separating cycle lane from traffic.

To overcome the problem, the Highway Department looked at two solutions. The first being to purchase a controller which would resolve the power supply issue but would cost approximately £8,000.00. The alternative was a new road layout with a roundabout which would make the flow of traffic easier.

Black and white RediKerb traffic islands guiding vehicles and protecting cycle lane at busy junction.
Black and white RediKerb installed alongside cycle lane, forming raised separator with bollard for traffic control.

RediKerb HB Surface Kerbing was installed and then back filled with asphalt which provided huge time saving for installation and minimised disruption to the local residents and road users.